ADU construction project by DreamPeak Builders in the Seattle area

ADUs & DADUs

ADU construction

A second home on your lot, built to full-house standards.

5–8 mo

Typical detached ADU construction window

Site-specific

Feasibility review before you commit to design

Full-house

Standards for a complete, year-round dwelling

The approach

Built the way it should be

Accessory dwelling units have become one of the smartest moves a Puget Sound homeowner can make, whether the goal is rental income, housing for family, or long-term flexibility. We build detached backyard cottages, attached ADUs, and garage and basement conversions. Recent Washington legislation has opened up ADU options in most of the cities we serve, but every jurisdiction still applies its own rules on size, height, parking, and utility connections, so we begin every ADU project with a site-specific feasibility review.

An ADU is a complete dwelling, and we build it like one. That means its own code-compliant kitchen and bath, proper egress, fire separation where required, and full insulation and ventilation designed for year-round comfort in our climate. Utility strategy is often the make-or-break detail: we evaluate whether your electrical service, water line, and sewer can support a second unit or need upsizing, and we price that reality into the project from day one instead of springing it on you later.

Because the work happens in your yard rather than your living room, ADU projects tend to be easier to live with than interior remodels. We establish site access, protect landscaping where we can, and keep a predictable crew schedule. You get the same weekly updates, transparent change process, and final walkthrough as any of our projects, plus documentation you will want if you ever rent or sell.

Signature materials & finishes

Poured foundations sized for the unitFull building envelope and weather barrierCode-compliant egress windows and doorsComplete kitchen and bathroom packagesDuctless mini-split heating and coolingYear-round insulation and ventilation

The process

How your adu construction runs

01

Feasibility and zoning

We run a site-specific review of your lot: size, height, setback, parking, and utility rules vary by city. You learn what is buildable before committing to design.

02

Design and utility strategy

We design the unit and evaluate whether your electrical service, water, and sewer can support a second dwelling or need upsizing, then price that reality into the project.

03

Shell and rough-in

Foundation, framing, and the weathertight shell go up in your yard, followed by electrical, plumbing, and mechanical rough-ins with fire separation and egress where required.

04

Build-out and closeout

We complete a code-compliant kitchen and bath, insulation, and finishes, then walk the unit with you and hand over the documentation you will want to rent or sell.

Before you start

Things to consider

A few tradeoffs worth thinking through early, while they are still cheap decisions rather than expensive change orders.

Detached, attached, or conversion+

A detached backyard cottage offers the most privacy and rental value; an attached ADU or a garage or basement conversion is often faster and cheaper because part of the shell exists. Your goals and lot decide which fits.

Utility capacity and cost+

Many ADUs share the main home's water and sewer with properly sized lines, but electrical often justifies a panel upgrade or separate meter. Utility work is the make-or-break line item, so we assess and price it during feasibility, not later.

Rental income versus flexibility+

Design choices differ if the goal is rental income, multigenerational living, or long-term resale value. A separate entrance, sound separation, and metering are worth planning up front around how you actually intend to use the unit.

Let's talk it through

Tell us about your adu construction and get real answers

Our concierge can walk you through scope, timeline, and what a project like yours involves, no pressure and no sales script. Or book a free consultation and we will come see the space.

Call +1 (206) 886-2439

Service area

Where we do this work

We build adu construction projects across Seattle and the Eastside. A few of the communities we serve:

Built to code

Every adu construction project we build is permitted and inspected. In Washington you can and should verify any contractor's standing before hiring, through the Washington State L&I contractor verification tool.

Straight answers

ADU construction questions

How long does an ADU project take?+

Design and permitting typically run 3 to 6 months depending on the city, and construction of a detached ADU usually takes 5 to 8 months. Garage and basement conversions are faster because the shell already exists.

Can I build an ADU on my property?+

In most of the cities we serve, yes, thanks to recent state law changes, but the details vary by jurisdiction: maximum size, height, setbacks, and utility requirements all differ. We run a feasibility check on your specific parcel before you commit to design, so you know what is buildable and what it involves.

Do ADUs need separate utilities?+

Not always separate, but always sufficient. Many ADUs share the main house's water and sewer with appropriately sized lines, while electrical often justifies a panel upgrade or separate meter. We assess your existing services during feasibility and include any required upgrades in the proposal.

Free consultation

Let's walk your home together

Tell us what isn't working. We'll bring options, honest numbers, and a plan — no pressure, no obligation.

CALL OR TEXT

+1 (206) 886-2439

Mon-Sat 9:00 AM - 5:00 PM

RESPONSE WITHIN ONE BUSINESS DAY